國文屋

位置:首頁 > 造句 > 

“macadam”造句,怎麼用macadam造句

造句1.09W

Shrinkage of cement stabilized macadam base course

The High-grade Road Lime-flyash-macadam Reflection Crack Reason and Prevention;

The construction and quality control of cement stabilized macadam base or sub-base

The results indicate that using cement stabilized aeolian sand and macadam, as base course for road is feasible.

The quality control process and key points of cement stabilized macadam construction are discussed from design, construction, construction technology and organization.

Use level survey to mark the paving design elevation of the cement stabilized macadam with obvious mark on indication piles both sides.

Mixture transportation: cement stabilized macadam should be transported by dump truck, and the quantity of dump truck should be reasonably prepared according to the paving capacity of the pavers, production capacity of the mixers, and the distance of transportation.

macadam造句

water - bound macadam

surface with macadam, of a road.

Mixing ratio design and construction technology of lime fly ash stabling macadam base

Right and wrong, have repeatedly bowed their heads, warm and cold human feelings, had no intention to see through, left home, grew up, accompanied by their parents less time.

The paper takes the first segment of the road surface in the ShenDaexpressway as an example, to introduce controlling the course of construction in anti-skid layer of the mastic asphalt macadam.

tar-macadam batch mixer

The construction techniques of cement treated macadam base are always paid more attention by highway constructors.

tar-macadam plant

Considering the serious waste of milled semi-rigid base in freeway overhaul, a technique on reclaimed lime-fly ash macadam used in rigid base was studied.

Mix proportion design of anti-crack cement stabilization macadam base

標籤:macadam 造句