國文屋

位置:首頁 > 造句 > 

“CTCS”造句,怎麼用CTCS造句

造句2.28W

Schema of Point with Large Number Keeping the Continuity of Bending Track Information in CTCS Level 2

隨着CTCS - 3級客運專線工程建設的加快,針對單個rbc的控制能力與RBC的設置原則進行研究很有必要。

CTCS造句

Modeling and Realizing of On-Board Equipment of CTCS-2 Train Operation Control System with UML;

The Application of 3D Scene Simulation Technology in the CTCS Level 3 Simulation System;

Research on the Automatic Testing Methodology of CTCS-3 Onboard Equipment

With speeding up the construction of the passenger dedicated line with CTCS-3 train control system, it is necessary to do the research on the RBC control ability and its arrangement principle.

Research on CTCS-3 Board-Ground Communication Protocol Conformance Testing Based on TTCN-3

標籤:造句 CTCS